Interim executive report for DOE’s Office of Science, NNSA, and Applied Energy Offices, in collaboration with the Artificial Intelligence and Technology Office, DOE AI roundtable workshops (December 2021 through February 2022) (“AI@DOE”). These workshops were used to help identify AI research requirements and priorities for the next decade for Department of Energy in developing machine-learning-based prediction and decision-support capabilities that address and anticipate DOE mission challenges. These missions’ challenges for AI include: AI to advance scientific discovery and technological innovation AI to support high consequence decisions while managing risk AI to improve DOE’s responsiveness to national & global issues AI to assist stewardship of the environment and national critical infrastructure These will be addressed in large part through the development and application of new and powerful artificial intelligence and/or machine learning algorithms and strategies. https://web.cvent.com/event/fc3922f8-fc75-4041-a317-f13a1da44f7c/summary?locale=en-US&i=2Wx2tjbStkydRFq_N2whPw
Federal Oil Research: A Strategy for Maximizing the Producibility of Known U.S. Oil, August 1989
This data provides the underlying project-level analysis and data sources complied in response to the DOE request to determine the amount of geothermal capacity that could be available to meet the President's request to double renewable energy capacity by 2020. The enclosed data contains compiled data on individual project names and locations (by geothermal area and region), ownership, estimated nameplate capacity, and project status, and also contains inferred data on the barriers and viability of the project to meet a 2020 development timeline. The analysis of this data is discussed in the attached NREL report.
Plans for Northwest National Marine Renewable Energy Center (NNMREC) Project. Mobile Ocean Test Berth (MOTB) plans PMEC-SETS Plans
Preliminary System Design Package for the Triton-C WEC, including a report and CAD drawings pertaining to the overall preliminary design, system arrangement, surface float hull, and surface float arrangement.