Analysis of Unit Mobility Ratio Well-to-Well Tracer Flow to Determine Reservoir Heterogeneity DOE/SF/11564-1
This endpoint provides a forward view of availability (also referred to as Output Useable data under the Grid Code) for generation and interconnector capacity, accounting for planned outages covering availability data from 2 days ahead to 14 days ahead; it is aggregated by National Grid Balancing Mechanism Units (NGC BMUs). In the context of this report, BMUs can be considered as generating units. Elexon BMUs differs from NGC BMUs by including a prefix e.g. 'T_'. The mapping between NGC and Elexon BMUs can be retrieved via reference data API endpoints.
This endpoint forward view of availability (also referred to as Output Useable data under the Grid Code) for generation and interconnector capacity, accounting for planned outages covering availability data from 2 weeks ahead to 156 weeks ahead; it is aggregated by Balancing Mechanism Units (BMUs). In the context of this report, BMUs can be considered as generating units. Elexon BMUs differs from NGC BMUs by including a prefix e.g. 'T_'. The mapping between NGC and Elexon BMUs can be retrieved via reference data API endpoints.