FOU2T3YW
Overview
This endpoint provides a forward view of availability (also referred to as Output Useable data under the Grid Code) for generation and interconnector capacity, accounting for planned outages covering availability data from 2 weeks ahead to 156 weeks ahead; it is aggregated by Fuel Types categories.
Additional Information
Key | Value |
---|---|
dcat:versionNotes | Initial test |
oe:sensitivityClass | OE-O |
Files
Related Dataset from Elexon (view all)
Other Datasets tagged output useable, interconnector, fuel, transmission, generation, capacity, availability, planned outages, forecast, ahead (view all)
Metered Wind Output in MW for 'Scotland' and 'England and Wales'. Output is provided per date per Settlement Period....
Elexon
View allAccess and Licensing
Access conditions
Any controls, requirements, or pre-requisites surrounding access to data
Licence conditions
None
Data Quality
Aggregation Method
Any controls, requirements, or pre-requisites surrounding access to data
Organisational Lineage
The licensing conditions controlling access to the data
Risks
Considerations, risks, and constraints around making assumptions based on specific datasets. e.g data health score
Confidence Level
The level of confidence associated with a specific dataset
Units
The units in which energy is described within a dataset