EP - Electricidade de Portugal (E-REDES)
EP - Electricidade de Portugal (E-REDES) was born as a result of a merger process of 13 companies in the Portuguese electricity sector, nationalized in 1975. EP - Electricidade de Portugal (E-REDES) is the main operator of the electricity distribution network in mainland Portugal of high, medium and low voltage networks.
Available Datasets
Title | Format(s) | Updated |
---|---|---|
Number of remote work orders carried outNumber of remote service orders (OSs) by type of service, by district, municipality and parish; monthly; history >20221. The information made available by E-REDES constitutes an approximation to the values... 2 No licence known |
CSV JSON | 2023-05-04 |
[cms] articlesNone 2 No licence known |
CSV JSON | 2023-05-04 |
New grid connections associated with electric mobilityNumber of new connections to the Grid associated with Electric Mobility per municipality (integrated in the Mobi.e grid). semester1. The information made available by E-REDES constitutes an approximation to... 2 No licence known |
CSV JSON | 2023-05-04 |
Municipalities - PortugalThis dataset is part of the Geographical repository maintained by Opendatasoft. This dataset contains data for municipalities in Portugal. Processors and tools are using this data.EnhancementsAdd Portugal ISO... 4 No licence known |
CSV JSON ZIP | 2023-05-04 |
Characterization of Public Lighting luminairesCharacterization of public lighting by District, county and parish. Identification of the number of luminaires, technology used and installed power.1. The information made available by E-REDES constitutes an... 2 No licence known |
CSV JSON | 2023-05-04 |
Number of low voltage delivery points with collection of Load DiagramsNumber of low voltage consumption sites with collection of load diagrams, by district, municipality and parish (incl. PCVEs). History >2022For the municipality of Évora, the data collection of remote readings... 2 No licence known |
CSV JSON | 2023-05-04 |
Active Energy InterruptionsNumber of active Power outages by zip code.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected.... 2 No licence known |
CSV JSON | 2023-05-04 |
Number of low voltage consumption locations with Remote ReadsNumber of low voltage consumption sites with remote readings collected from smart meters, by district, municipality and parish. History >2022For the municipality of Évora, the data collection of remote... 2 No licence known |
CSV JSON | 2023-05-04 |
New connections to the network of power generation centersNumber of executed grid connection requests and connection power for new Renewable Production Units per municipality. semester valueIncludes UPAC with power greater than 1MW.1. The information made available... 2 No licence known |
CSV JSON | 2023-05-04 |
Service continuity indicators by municipalityGeneral service continuity indicators by municipality, with details of long interruptions (accidental + foreseen) for HV, MV and BT and short interruptions (accidental + foreseen) for AT and MV.1. The... 2 No licence known |
CSV JSON | 2023-05-04 |
Network connectionsNumber of completed Grid Connection Requests, by municipality; semester1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment... 2 No licence known |
CSV JSON | 2023-05-04 |
Characterization of Consumption Points (CPEs), with active contractsCharacterization of consumption points with active contracts, by voltage level, by sector of activity, by location and type of installation.1. The information made available by E-REDES constitutes an... 2 No licence known |
CSV JSON | 2023-05-04 |
Hourly consumption by postal code.Consumo horário por código Postal.Este DataSet é construído com base nos diagramas de carga recolhidos pelos contadores inteligentes. Em casos onde não existem ainda contadores com a capacidade de realizar... 2 No licence known |
CSV JSON | 2023-05-04 |
Monthly consumption by municipalityMonthly consumption by district, municipality, parish and voltage level; historical since Nov-2020.1. The information made available by E-REDES constitutes an approximation to the values taken from the... 2 No licence known |
CSV JSON | 2023-05-04 |
New production units for self-consumptionNumber of new Small Production Units (UPAC) completed by municipality and connection power.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is... 2 No licence known |
CSV JSON | 2023-05-04 |
Monthly consumption by zip codeTotal monthly consumption by zip code; historical since Nov-2020.Consumptions (active energy) that were billed since Nov-2020. The year/month refers to the period of consumption (not the time of... 2 No licence known |
CSV JSON | 2023-05-04 |
Number of active energy contracts by meter typeNumber of energy contracts by type of meter (smart or non-smart meter), by District, municipality and parish.Only active contracts are considered.1. The information made available by E-REDES constitutes an... 2 No licence known |
CSV JSON | 2023-05-04 |
[cms] news-eventsNone 2 No licence known |
CSV JSON | 2023-05-04 |
Scheduled Energy interruptionsScheduled outages aggregated by zip code.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected.... 2 No licence known |
CSV JSON | 2023-05-04 |
Total production Units for Self-ConsumptionTotal number of Production Units for Self-Consumption (UPAC) per municipality, per power level and total installed power; quarterly.Total UPAC certified and connected to the network operated by E-REDES, with... 2 No licence known |
CSV JSON | 2023-05-04 |