EP - Electricidade de Portugal (E-REDES)
L o a d i n g
EP - Electricidade de Portugal (E-REDES) was born as a result of a merger process of 13 companies in the Portuguese electricity sector, nationalized in 1975. EP - Electricidade de Portugal (E-REDES) is the main operator of the electricity distribution network in mainland Portugal of high, medium and low voltage networks.
Available DatasetsShowing 20 of 20 results
- Number of remote service orders (OSs) by type of service, by district, municipality and parish; monthly; history >20221. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES to obtain updated information.1Licence not specifiedover 2 years ago
- over 2 years ago
- Number of new connections to the Grid associated with Electric Mobility per municipality (integrated in the Mobi.e grid). semester1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES in order to obtain updated information.1Licence not specifiedover 2 years ago
- This dataset is part of the Geographical repository maintained by Opendatasoft. This dataset contains data for municipalities in Portugal. Processors and tools are using this data.EnhancementsAdd Portugal ISO 3166-3 code.Simplify geometries to provide better performance across the services.1Licence not specifiedover 2 years ago
- Characterization of public lighting by District, county and parish. Identification of the number of luminaires, technology used and installed power.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES in order to obtain updated information.1Licence not specifiedover 2 years ago
- Number of low voltage consumption sites with collection of load diagrams, by district, municipality and parish (incl. PCVEs). History >2022For the municipality of Évora, the data collection of remote readings and load diagrams do not include CPE with 1st generation meters, as this equipment is being progressively replaced until the end of 2024.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES to obtain updated information.1Licence not specifiedover 2 years ago
- Number of active Power outages by zip code.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES in order to obtain updated information.1Licence not specifiedover 2 years ago
- Number of low voltage consumption sites with remote readings collected from smart meters, by district, municipality and parish. History >2022For the municipality of Évora, the data collection of remote readings and load diagrams do not include CPE with 1st generation meters, as this equipment is being progressively replaced until the end of 2024.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES to obtain updated information.1Licence not specifiedover 2 years ago
- Number of executed grid connection requests and connection power for new Renewable Production Units per municipality. semester valueIncludes UPAC with power greater than 1MW.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES to obtain updated information.1Licence not specifiedover 2 years ago
- General service continuity indicators by municipality, with details of long interruptions (accidental + foreseen) for HV, MV and BT and short interruptions (accidental + foreseen) for AT and MV.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES to obtain updated information.1Licence not specifiedover 2 years ago
- Number of completed Grid Connection Requests, by municipality; semester1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES to obtain updated information.1Licence not specifiedover 2 years ago
- Characterization of consumption points with active contracts, by voltage level, by sector of activity, by location and type of installation.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES to obtain updated information.1Licence not specifiedover 2 years ago
- Consumo horário por código Postal.Este DataSet é construído com base nos diagramas de carga recolhidos pelos contadores inteligentes. Em casos onde não existem ainda contadores com a capacidade de realizar estas recolhas, ou exista dificuldade de comunicação com os mesmos, é realizada uma perfilagem de consumos.Consulte aqui o documento que sistematiza a metodologia de estimação dos diferentes perfis. (https://www.e-redes.pt/sites/eredes/files/2021-08/DocMetodologico_Perfis.pdf)1. A Informação disponibilizada pela E-REDES constitui uma aproximação aos valores retirados de sistema e tem por referência o momento em que a mesma é recolhida. Atendendo a que os pontos de ligação, a rede de distribuição de eletricidade, e os próprios valores de consumo e de produção são naturalmente muito dinâmicos, salvaguarda-se que a informação disponibilizada poderá ser objeto de subsequentes alterações e atualizações, ficando igualmente ressalvadas eventuais omissões e/ou pontuais imprecisões de localização que a informação poderá conter.2. Desta forma a E-REDES não se responsabiliza perante terceiros, nomeadamente, parceiros, prestadores de serviços, empreiteiros, utentes e clientes, pelos danos que possam surgir em consequência, direta ou indireta, do uso da presente Informação, em particular aquando da realização de intervenções, cálculos e/ou estimativas, sem confirmação da exatidão e atualização dos dados, pelo que devidamente se ressalva de que a consulta da presente informação não prejudica o dever de se promover uma consulta direta à E-REDES para obter informação atualizada.1Licence not specifiedover 2 years ago
- Monthly consumption by district, municipality, parish and voltage level; historical since Nov-2020.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES to obtain updated information.1Licence not specifiedover 2 years ago
- Number of new Small Production Units (UPAC) completed by municipality and connection power.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES in order to obtain updated information.1Licence not specifiedover 2 years ago
- Total monthly consumption by zip code; historical since Nov-2020.Consumptions (active energy) that were billed since Nov-2020. The year/month refers to the period of consumption (not the time of billing).Consumption data may change due to new billing adjustments for past consumption.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES in order to obtain updated information.1Licence not specifiedover 2 years ago
- Number of energy contracts by type of meter (smart or non-smart meter), by District, municipality and parish.Only active contracts are considered.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES to obtain updated information.1Licence not specifiedover 2 years ago
- over 2 years ago
- Scheduled outages aggregated by zip code.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES in order to obtain updated information.1Licence not specifiedover 2 years ago
- Total number of Production Units for Self-Consumption (UPAC) per municipality, per power level and total installed power; quarterly.Total UPAC certified and connected to the network operated by E-REDES, with an active contract, on the last day of the quarter under analysis.1. The information made available by E-REDES constitutes an approximation to the values taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES to obtain updated information.1Licence not specifiedover 2 years ago
Title
Updated
