Low Carbon Contracts Company Limited
L o a d i n g
The Low Carbon Contracts Company (LCCC) and the Electricity Settlements Company (ESC) sit at the heart of the delivery of the UK’s goals for secure, affordable and sustainable electricity. These two private limited companies, wholly owned by the Secretary of State for Business, Energy and Industrial Strategy (BEIS) formerly known as Department for Energy and Climate Change (DECC), were created to deliver key elements of the government’s Electricity Market Reform Programme. As government-owned companies, LCCC and ESC are governed by Framework Documents setting out the shareholder relationship and their Guiding Principle.
Available DatasetsShowing 48 of 48 results
- This dataset includes the historic actual CfD generation (from 2016) eligible for CfD payments, payments made to CfD generators, estimated GHG avoided from the CfD Portfolio and the equivalent avoided GHG cost. This dataset can be filtered based on CfD ID, Technology type, Connection type and Allocation Process. Please note all cost and payment values are in nominal terms. This dataset also includes Baseload Market Reference Prices (BMRP) and Intermittent Market Reference Prices (IMRP) averaged over selected time periods along with the generation weighted average IMRP (capture price), which is calculated based on the intermittent generation volume. The Baseload Market Reference Price (BMRP) is calculated on a seasonal basis using a traded volume weighted average based on forward season data received from LEBA. The Intermittent Market Reference Price (IMRP) is the GB Day Ahead Hourly Price published by the Intermittent Day Ahead Indices. This dataset is updated daily.321 hours ago
- This dataset includes the historic monthly CM auction Capacity Obligation and actual Capacity Payments for a delivery year which covers the period from October to September. It also includes the CM units which are suspended following failure to complete Satisfactory Performance Day and Extended Performance tests. Note: Capacity Obligation and Capacity Payments for a Delivery Year can also be delayed and lost through failure to complete New Build CMU milestones and/or through termination (either prior to DY start, or during the DY) which is not presented in this dataset. Dataset can be filtered based on Auction and Delivery Year. ( For example, the "2019/20 Delivery Year" will run from 1 October 2019 to 30 September 2020) This dataset is updated daily.321 hours ago
- This dataset includes the determined Interim Levy Rates(ILR) and the actual daily Interim Levy Rate payments (ILR Income) received by LCCC from electricity suppliers. Energy Intensive Industries (EII) are those industries that are determined by the Department for Business and Trade (DBT) as intensive users of electricity. They are exempted from paying CfD levy, up to 100% of Supplier's daily gross demand. This dataset is updated daily.321 hours ago
- This directory displays those Capacity Providers that may be eligible for Secondary Trading due to them meeting the conditions in Rule 9.2.6 of the Capacity Market Rules. This directory is available in excel format and as a dashboard. This directory is refreshed weekly.321 hours ago
- This dataset includes the 24 month forecast of Capacity Market monthly payments. The forecast monthly CM costs are estimated as the Auction Acquired Capacity Obligation (kW) × Adjusted Capacity Cleared Price (£/kW/year) × Monthly Weighting Factor. The capacity obligation is valued at the relative CM auction Capacity Cleared Price (CCP) and is adjusted for UK Consumer Prices Index (CPI) for T-4 Auctions only. “CPI” means the UK Consumer Prices Index (All Items) published monthly by the Office for National Statistics.321 hours ago
- This dataset includes the monthly actual Eligible Demand, actual Energy Intensive Industries Excluded Demand, and proportion of the CfD generation volume as a percentage of the Eligible Demand. Energy Intensive Industries (EII) are those industries that are determined by the Department for Business and Trade (DBT) as intensive users of electricity. They are exempted from paying CfD levy, up to 100% of Supplier's daily gross demand. This dataset is updated daily.321 hours ago
- This dataset includes the actual Intermittent Market Reference Price (IMRP) by date and hourly period. The IMRP is the GB Day Ahead Hourly Price published by the Intermittent Day Ahead Indices. The IMRP is calculated as a weighted average across the Day Ahead Indices. This dataset is updated daily.321 hours ago
- The CfD Locations by Parliamentary Constituency dataset contains the geographical location and generation/avoided emissions metrics associated with CfD projects alongside the constituency, MP, political party or region.321 hours ago
- This dataset contains the actual daily CfD Payments and the latest forecast of daily CfD payments compared to the initial forecast. This dataset is updated weekly.33 days ago
- This dataset details the relationship between registered BM Units and CfDs. This dataset is only updated following changes to the mapping data.34 days ago
- This dataset includes the ILR and TRA for the Nuclear RAB scheme. These are calculated from the RABP (Revenue Amount Before Power) provided from Ofgem. It also contains the actual generator and supplier payments for each month in the quarter.3last week
- This dataset includes the ILR and TRA forecasts for the Nuclear RAB scheme. These are calculated from the RABP (Revenue Amount Before Power) provided from Ofgem. It also contains the forecasted generator and supplier payments for each month in the quarter.3last week
- This dataset includes the Nuclear RAB actual daily reconciled levy rates and eligible demand volume (EII exempted) for each performed settlement run type. Energy Intensive Industries (EII) are those industries that are determined by the Department for Business and Trade (DBT) as intensive users of electricity. They are exempted from paying CfD levy, up to 100% of Supplier's daily gross demand. This dataset is updated following the end of each Quarterly Obligation Period.33 weeks ago
- This dataset includes the actual non generation payments per quarter since 2022. This dataset is updated following the end of each Quarterly Obligation Period.33 weeks ago
- This dataset includes the Daily forecast CfD payments to generators for the current and following operational quarters, by technology type. This dataset is updated following the end of each Quarterly Obligation Period.33 weeks ago
- This dataset includes the hourly forecast CfD generation for the current and following operational quarters, by technology type. This generation is adjusted by TLM (Transmission Loss Multiplier), RQM (Renewable Qualifying Multiplier based on the renewable content of the fuels used for generation) and CHPQM (Combined Heat and Power Qualifying Multiplier to ensure that only generated output from low carbon sources which produce good CHP is eligible for CfD Payments) This dataset is updated following the end of each Quarterly Obligation Period.33 weeks ago
- This dataset includes the actual daily reconciled levy rates and eligible demand volume (EII and GEE exempted) for each performed settlement run type. Energy Intensive Industries (EII) are those industries that are determined by the Department for Business and Trade (DBT) as intensive users of electricity. They are exempted from paying CfD levy, up to 100% of Supplier's daily gross demand. Eligible power generated abroad and supplied to GB can be used to reduce a suppliers’ liability for the CfD levy. Green Excluded Electricity (GEE) means any amount of electricity determined as such. This dataset is updated following the end of each Quarterly Obligation Period.33 weeks ago
- This dataset includes the daily forecasted weighted average Baseload Market Reference Prices and Intermittent Market Reference Prices for the current and following operational quarters, by technology type. Baseload Market Reference Price is the value used as a reference point to calculate difference payments for applicable generators. The BMRP is calculated on a seasonal basis using a traded volume weighted average based on forward season data received from LEBA. The BMRP is published in April and October of each year. Intermittent Market Reference Price is used as a reference point to calculate difference payments for applicable generators. It is calculated from the GB Day Ahead Hourly Price published by Day Ahead Indices. This dataset is updated following the end of each Quarterly Obligation Period. Please note that our forecasts simulate hourly prices across multiple scenarios, and the published prices represent the averages derived from these simulations over the quarter. Consequently, the capture price differences cannot be back-calculated from these averaged values as this detailed information is lost in the hourly averaging process over the simulations, but are taken into account in individual simulations.33 weeks ago
- This dataset includes the Daily forecast supplier payments for the current and following operational quarters. This dataset is updated following the end of each Quarterly Obligation Period.33 weeks ago
- This dataset provides a forecast out of 6 months. https://www.lowcarboncontracts.uk/resources/scheme-dashboards/interim-levy-rate-and-total-reserve-amount/. This dataset contains Interim Levy Rate , Total Reserve Amount and CfD Payment forecasts for two Quarterly Obligation Periods. It also contains the Eligible Demand for the whole Quarterly Obligation Period. This dataset is updated following the end of each Quarterly Obligation Period. Please note that our forecasts simulate hourly prices across multiple scenarios, and the published prices represent the averages derived from these simulations over the quarter. Consequently, the capture price differences cannot be back-calculated from these averaged values as this detailed information is lost in the hourly averaging process over the simulations, but are taken into account in individual simulations.33 weeks ago
- This dataset includes each CfD Contract, its Maximum Contract Capacity and latest status of each project. Status of each CfD project is determined based on the notices issued by LCCC when different milestones get past. Start date is the best estimate date on which the generator will start generating. This dataset is updated monthly.34 weeks ago
- This dataset combines quarterly CfD payments and demand with nRAB scheme inputs for the price cap inputs period. It includes CfD payment and demand data used in levy calculations, alongside the nRAB TRA and ILR amounts applied under the price cap methodology.3last month
- This dataset provides historical Supplier Obligation Two Year forecast data. Different levels of sensitivity have been applied on forecasting the figures and are termed as base case, low case, and high case sensitivities. The base case assumes our best view of Start Dates and Market Reference Prices. This dataset includes all historical Supplier Obligation Two Year forecasts published from September 2015, including the current Supplier Obligation Two Year forecast, which can also be found in the Supplier Obligation Two Year forecasts dataset. This dataset is updated quarterly once the new Two Year forecast is available.3last month
- This dataset provides a forecast out to 2 years. This dataset contains Interim Levy Rate , Total Reserve Amount, LCDCfD & CfD Payment forecasts, LCDCfD & CfD generation adjusted by TLM, RQM and CHPQM and aggregated Capacity, for six Quarterly Obligation Periods. Different levels of sensitivity have been applied on forecasting the figures and are termed as base case, low case, and high case sensitivities. The base case assumes our best view of Start Dates and Market Reference Prices. This dataset is updated following the end of each Quarterly Obligation Period.3last month
- This dataset includes forecast time weighted Intermittent Market Reference Prices (IMRP) and generation weighted IMRP. This dataset is updated following the end of each Quarterly Obligation Period. Please note that our forecasts simulate hourly prices across multiple scenarios, and the published prices represent the averages derived from these simulations over the quarter. Consequently, the capture price differences cannot be back-calculated from these averaged values as this detailed information is lost in the hourly averaging process over the simulations, but are taken into account in individual simulations.3last month
- This dataset provides a forecast out to 24 months. This dataset contains Supplier Obligation generation forecasts for six Quarterly Obligation Periods. Different levels of sensitivity have been applied on forecasting the figures and are termed as base case, low case, and high case sensitivities. The base case assumes our best view of Start Dates and Market Reference Prices. This dataset is updated following the end of each Quarterly Obligation Period.3last month
- DESNZ publishes the outcome of each Allocation Round to coincide with National Grid notifying the qualifying applicants of the outcome. This dataset is taken from these publications: - [Contracts for difference Allocation Round 1 Results](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/407059/Contracts_for_Difference_-_Auction_Results_-_Official_Statistics.pdf) - [Contracts for difference Allocation Round 2 Results](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/643560/CFD_allocation_round_2_outcome_FINAL.pdf) - [Contracts for difference Allocation Round 3 Results](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/915678/cfd-ar3-results-corrected-111019.pdf) - [Contracts for Difference Allocation Round 4 Results](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1103022/contracts-for-difference-allocation-round-4-results.pdf) - [Contracts for Difference Allocation Round 5 Results](https://assets.publishing.service.gov.uk/media/64fa0473fdc5d10014fce820/cfd-ar5-results.pdf) - [Contracts for Difference Allocation Round 6 Results](https://assets.publishing.service.gov.uk/media/66d6ad7c6eb664e57141db4b/Contracts_for_Difference_Allocation_Round_6_results.pdf)32 months ago
- This dataset provides forecast and actual Winter Peak Gross Demands up to 23/24 and forecast and actual Winter Peak Relevant Demand from 24/25 by delivery years. Under the Capacity Market (CM), Suppliers are obligated to pay a monthly CM Supplier Charge to cover the costs of Capacity Provider payments, where they have made a supply during the Peak Period. Up to and including Winter 23/24 this charge was apportioned across Suppliers by their share of the Total Gross Demand for the Peak Period within a Delivery Year. From Winter 24/25 onwards this charge is apportioned across Suppliers by their share of the Total Relevant Demand for the Peak Period within a Delivery Year. The Peak Period shall mean the Winter months between Nov - Feb (inclusive). For Data for Winter 24/25 onwards 100% exemption for EII applies (Relevant Demand).32 months ago
- This dataset includes the future CfD generation weighted average strike prices (£/MWh) estimated by LCCC using 2020 real prices. It also includes the weighted average strike prices for the whole CfD portfolio including bespoke contracts, investment contracts, CfDs awarded under different allocation rounds to date and annual forecast market prices estimated by DESNZ ([Annex m price growth assumption 16 May 2019](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/802478/Annex-m-price-growth-assumption_16-May-2019.ods)) This dataset is updated following the end of each financial year.32 months ago
- The estimated notional Monetary Budget impact (as strike prices are below the reference prices), as calculated by National Grid ESO according to the Allocation Framework, presuming all offered contracts are accepted (2012 prices). This dataset is taken from these publications: - [Contracts for Difference Allocation Round One Outcome](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/407059/Contracts_for_Difference_-_Auction_Results_-_Official_Statistics.pdf) - [Contracts for Difference Allocation Round Two Outcome](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/643560/CFD_allocation_round_2_outcome_FINAL.pdf) - [Contracts for Difference Allocation Round Three Outcome](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/915678/cfd-ar3-results-corrected-111019.pdf)32 months ago
- This dataset includes the future CfD generation eligible for CfD payments estimated by LCCC until the end of the CfD contract, by financial year (1 April to 31 March). Expected generation beyond the CfD term assumes that plants will continue to generate beyond the end of the CfD contract, based on average plant lifetimes. Avoided greenhouse gas (GHG) emissions are calculated based on the National Grid's emissions minus life-cycle CfD emissions for each technology. A constant emissions factor is used per contract according to the start year of each contract. This dataset is updated on an annual basis.32 months ago
- The CfD Allocation Regulations stipulate that DESNZ must issue a Budget Notice for each Allocation Round setting out the overall budget for each delivery year, Administrative Strike Prices (ASPs) and any maxima or minima that may apply. DESNZ publishes a Draft Budget Notice in advance of the Final Budget Notice. This dataset takes the ASP data of each Technology type per year and the relevant Maxima/Minima from these publications: - [Revised Budget Notice for CFD Allocation Round 1](https://assets.publishing.service.gov.uk/media/5a7ef7a4ed915d74e62279c3/150127_Budget_Revision_Notice_for_CfD_Round_One.pdf) - [Budget Notice for CFD Allocation Round 2](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/598824/Budget_Notice.pdf) - [Budget Notice for CFD Allocation Round 3](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/798885/Final_Budget_Notice_AR3.pdf) - [Revised Budget Notice for CFD Allocation Round 4](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1077248/cfd4-allocation-budget-revision-notice.pdf) - [Budget Notice for CFD Allocation Round 5](https://assets.publishing.service.gov.uk/media/65f98334703c42001a58ef27/cfd-ar5-allocation-budget-notice-2023.pdfhttps://assets.publishing.service.gov.uk/media/65f98334703c42001a58ef27/cfd-ar5-allocation-budget-notice-2023.pdf) - [Budget Notice for CFD Allocation Round 6](https://assets.publishing.service.gov.uk/media/65e867c162ff48001a87b252/cfd-ar6-budget-notice.pdf)32 months ago
- This dataset contains daily generation, CfD payments, and reference prices aggregated by technology. It is sourced from the Two-Year Forecast, covering quarters Q1 2026 to Q2 2027, and includes only the base case scenario. The dataset was created to fulfil a one-off data request and will not be updated in the future.32 months ago
- __As of Friday 8 August 2025, the SPD Pass Report is now published on the EMRS website.__ __The SPD Pass Report is available via the SPD Report dropdown in the [Settlement Data for Capacity Providers](https://www.emrsettlement.co.uk/settlement-data/settlement-data-capacity-providers/) section.__02 months ago
- The Budget Notices set out the key auction parameters for the Allocation Round, namely the available spend on applicants for the round and the parameters against which applicant bids will be assessed. DESNZ publishes a Draft Budget Notice in advance of a Final Budget Notice. Administrative Strike Price, Maxima, and Minima parameter values can be found in the "Administrative Strike Price, Maxima, and Minima" dataset: https://www.lowcarboncontracts.uk/data-portal/dataset/administrative-strike-prices This dataset takes the Budget and Capacity Cap of each Technology Group per year from these publications: - [Budget Notice for CFD Allocation Round 1](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/336101/draft_cfd_budget_notice.pdf) - [Budget Notice for CFD Allocation Round 2](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/360129/CFD_Budget_Notice.pdf) - [Budget Notice for CFD Allocation Round 3](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/398665/150127_Budget_Revision_Notice_for_CfD_Round_One.pdf) - [Budget Notice for CFD Allocation Round 4](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/598824/Budget_Notice.pdf) - [Budget Notice for CFD Allocation Round 5](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/798885/Final_Budget_Notice_AR3.pdf) - [Budget Notice for CFD Allocation Round 6](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1016774/cfd-ar4-draft-budget-notice.pdf)32 months ago
- Further to the terms and conditions as set out in regulation 9 of the Contracts for Difference (Standard Terms) Regulations 2014, the Secretary of State informs the CfD Counterparty that the following issued categories are to be used in the allocation round. This dataset is taken from these publications:- - [CFD Auction Standard Terms Notice Allocation Round 1](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/348202/The_Contracts_for_Difference__Standard_Terms__Regulations_2014_-_CFD_Standard_Terms_Notice__29_August_2014_.pdf) - [CFD Auction Standard Terms Notice Allocation Round 2](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/598827/CFD_STANDARD_TERMS_NOTICE.pdf) - [CFD Auction Standard Terms Notice Allocation Round 3](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/799048/Standard_Terms_Notice_AR3.pdf) - [CFD Auction Standard Terms Notice Allocation Round 4](https://assets.publishing.service.gov.uk/media/619e7548d3bf7f0555071bd2/cfd-allocation-round-4-standard-terms-notice.pdf) - [CFD Auction Standard Terms Notice Allocation Round 5](https://assets.publishing.service.gov.uk/media/65f98becaa9b760011fbda95/cfd-allocation-round-5-standard-terms-notice.pdf) - [CFD Auction Standard Terms Notice Allocation Round 6](https://assets.publishing.service.gov.uk/media/65e85ee662ff48001a87b243/cfd-ar6-standard-terms-notice.pdf) - [CFD Auction Standard Terms Notice Allocation Round 7](https://assets.publishing.service.gov.uk/media/6881f6e7f47abf78ca1d35cd/ar7-standard-terms-notice.pdf)32 months ago
- This dataset includes the actual, forecast, and excess CfD Operational Costs and demand volumes for the current and historic operational periods. An electricity supplier must make a payment (“an operational cost payment”) to the CfD counterparty for each day that supplier makes an electricity supply during an operational cost period. The amount of an operational cost payment to be paid by a supplier for a day is equal to the amount of electricity supplied by that supplier on that day multiplied by the operational levy rate. Any amounts received by the CfD counterparty greater than the costs it incurred in respect of the relevant period must be paid back to electricity suppliers. This dataset is updated following the end of each financial year.32 months ago
- This dataset includes the actual, forecast, and excess Settlement Costs Levy for the current and historic operational periods. The operational costs of Electricity Settlements Company (ESC) are funded by suppliers through the Capacity Market Settlement Costs Levy, which is invoiced monthly based on a supplier’s share of net demand for periods of high demand in the previous financial year multiplied by the total operational costs. Any excess amount will be refunded to Suppliers using a payment share based on the amount of Settlement Costs Levy Payments paid in the Financial Year. This dataset is updated following the end of each financial year.32 months ago
- This dataset includes the actual, forecast, and excess CfD Operational Costs and demand volumes for the current and historic operational periods. An electricity supplier must make a payment (“an operational cost payment”) to the CfD counterparty for each day that supplier makes an electricity supply during an operational cost period. The amount of an operational cost payment to be paid by a supplier for a day is equal to the amount of electricity supplied by that supplier on that day multiplied by the operational levy rate. Any amounts received by the CfD counterparty greater than the costs it incurred in respect of the relevant period must be paid back to electricity suppliers. This dataset is updated following the end of each financial year.33 years ago
- The estimated notional Monetary Budget impact (as strike prices are below the reference prices), as calculated by National Grid ESO according to the Allocation Framework, presuming all offered contracts are accepted (2012 prices). This dataset is taken from these publications:- [https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/407059/Contracts_for_Difference_-_Auction_Results_-_Official_Statistics.pdf](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/407059/Contracts_for_Difference_-_Auction_Results_-_Official_Statistics.pdf) [https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/643560/CFD_allocation_round_2_outcome_FINAL.pdf](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/643560/CFD_allocation_round_2_outcome_FINAL.pdf) [https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/915678/cfd-ar3-results-corrected-111019.pdf](https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/915678/cfd-ar3-results-corrected-111019.pdf)34 years ago
- This dataset includes future CfD generation eligible for CfD payments estimated by LCCC until the end of the CfD contract, by financial year (April to March) and expected generation beyond the end of the CfD term, assuming that plants will continue to generate a further 10 years after the end of the CfD contract. Avoided Greenhouse Gas (GHG) emissions are calculated based on BEIS generation-based long-run marginal electricity emissions factors( https://www.gov.uk/government/publications/valuation-of-energy-use-and-greenhouse-gas-emissions-for-appraisal) This dataset is updated following the end of each financial year.34 years ago
- This dataset includes the actual, forecast, and excess Settlement Costs Levy for the current and historic operational periods. The operational costs of Electricity Settlements Company (ESC) are funded by suppliers through the Capacity Market Settlement Costs Levy, which is invoiced monthly based on a supplier’s share of net demand for periods of high demand in the previous financial year multiplied by the total operational costs. Any excess amount will be refunded to Suppliers using a payment share based on the amount of Settlement Costs Levy Payments paid in the Financial Year. This dataset is updated following the end of each financial year.34 years ago
- The Budget Notices set out the key auction parameters for the Allocation Round, namely the available spend on applicants for the round and the parameters against which applicant bids will be assessed. BEIS publishes a Draft Budget Notice in advance of a Final Budget Notice. Administrative Strike Price, Maxima, and Minima parameter values can be found in the "Administrative Strike Price, Maxima, and Minima" dataset: https://www.lowcarboncontracts.uk/data-portal/dataset/administrative-strike-prices This dataset takes the Budget and Capacity Cap of each Technology Group per year from these publications:- https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/336101/draft_cfd_budget_notice.pdf https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/360129/CFD_Budget_Notice.pdf https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/398665/150127_Budget_Revision_Notice_for_CfD_Round_One.pdf https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/598824/Budget_Notice.pdf https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/798885/Final_Budget_Notice_AR3.pdf https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1016774/cfd-ar4-draft-budget-notice.pdf34 years ago
- Under the Capacity Market (CM), Suppliers are obligated to pay a monthly CM Supplier Charge to cover the costs of Capacity Provider payments, where they have made a supply during the Peak Period. This charge is apportioned across Suppliers by their share of the Total Gross Demand for the Peak Period within a Delivery Year. The Peak Period shall mean the Winter months between Nov – Feb (inclusive). This dataset provides forecast and actual Winter Peak Gross Demands by delivery years.34 years ago
- Further to the terms and conditions as set out in regulation 9 of the Contracts for Difference (Standard Terms) Regulations 2014, the Secretary of State informs the CfD Counterparty that the following issued categories are to be used in the allocation round. This dataset is taken from these publications:- https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/348202/The_Contracts_for_Difference__Standard_Terms__Regulations_2014_-_CFD_Standard_Terms_Notice__29_August_2014_.pdf https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/598827/CFD_STANDARD_TERMS_NOTICE.pdf https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/799048/Standard_Terms_Notice_AR3.pdf https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1016684/draft-allocation-framework-cfd-ar4.pdf34 years ago
- The CfD Allocation Regulations stipulate that BEIS must issue a Budget Notice for each Allocation Round setting out the overall budget for each delivery year, Administrative Strike Prices (ASPs) and any maxima or minima that may apply. BEIS publishes a Draft Budget Notice in advance of the Final Budget Notice. This dataset takes the ASP data of each Technology type per year and the relevant Maxima/Minima from these publications:- https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/336101/draft_cfd_budget_notice.pdf https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/360129/CFD_Budget_Notice.pdf https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/598824/Budget_Notice.pdf https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/798885/Final_Budget_Notice_AR3.pdf https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1016774/cfd-ar4-draft-budget-notice.pdf34 years ago
- This dataset includes the future CfD generation weighted average strike prices (£/MWh) estimated by LCCC using 2020 real prices. It also includes the weighted average strike prices for the whole CfD portfolio including bespoke contracts, investment contracts, CfDs awarded under different allocation rounds to date and annual forecast market prices estimated by BEIS (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/802478/Annex-m-price-growth-assumption_16-May-2019.ods) This dataset is updated following the end of each financial year.34 years ago
- EMRS, on behalf of ESC calculates the weighting factor. Capacity Provider’s Capacity Payments, Supplier’s Capacity Market Supplier Charge and Credit Cover requirements will vary from month to month as the monthly weighting factors are used to calculate payments.34 years ago