Introduction The Long Term Development Statement (LTDS) report on a 0-5 year period, describing a forecast of load on the network and envisioned network developments. The LTDS is published at the end of May and November each year. This is Table 1 from our current LTDS report (published 29 November 2024), showing the circuit associated with each Grid and Primary substation. More information and full reports are available from the landing page below: Long Term Development Statement and Network Development Plan Landing Page — UK Power Networks (opendatasoft.com) Methodological Approach Site Functional Locations (FLOCs) are used to associate the From Substation to Key characteristics of active Grid and Primary sites — UK Power Networks ID field added to identify row number for reference purposes Quality Control Statement Quality Control Measures include: Verification steps to match features only with confirmed functional locations. Manual review and correction of data inconsistencies Use of additional verification steps to ensure accuracy in the methodology Assurance Statement The Open Data Team and Network Insights Team worked together to ensure data accuracy and consistency. Other Download dataset information: Metadata (JSON) Definitions of key terms related to this dataset can be found in the Open Data Portal Glossary: Open Data Portal Glossary
L o a d i n g
OverviewLTDS
Additional Information
KeyValue
guidhttps://ukpowernetworks.opendatasoft.com/api/v2/catalog/datasets/ltds-table-1-circuit-data
identifierltds-table-1-circuit-data
language["http://id.loc.gov/vocabulary/iso639-1/en"]
theme["https://ukpowernetworks.opendatasoft.com/id/theme/Network Infrastructure"]
urihttps://ukpowernetworks.opendatasoft.com/api/v2/catalog/datasets/ltds-table-1-circuit-data
harvest_object_ide896dd32-9bf7-4015-95ab-af6e81ee0e68
harvest_source_id4228bca6-c4ef-4f4e-ad91-8b9aa1781a89
harvest_source_titleUK Power Networks