IntroductionThe Long Term Development Statements (LTDS) report on a 0-5 year period, describing a forecast of load on the network and envisioned network developments. The LTDS is published at the end of May and November each year. This is Table 3a from our current LTDS report (published 29 November 2024), showing the observed substation peak demands with no correction for demand served by generation. More information and full reports are available from the landing page below: Long Term Development Statement and Network Development Plan Landing Page Methodological Approach Site Functional Locations (FLOCs) are used to associate the Substation to Key characteristics of active Grid and Primary sites — UK Power Networks ID field added to identify row number for reference purposes Quality Control Statement Quality Control Measures include: Verification steps to match features only with confirmed functional locations. Manual review and correction of data inconsistencies. Use of additional verification steps to ensure accuracy in the methodology. Assurance Statement The Open Data Team and Network Insights Team worked together to ensure data accuracy and consistency. Other Download dataset information: Metadata (JSON) Definitions of key terms related to this dataset can be found in the Open Data Portal Glossary: https://ukpowernetworks.opendatasoft.com/pages/glossary/
L o a d i n g
Overview
Additional Information
KeyValue
guidhttps://ukpowernetworks.opendatasoft.com/api/v2/catalog/datasets/ltds-table-3a-load-data-observed
identifierltds-table-3a-load-data-observed
language["http://id.loc.gov/vocabulary/iso639-1/en"]
theme["https://ukpowernetworks.opendatasoft.com/id/theme/Network Infrastructure", "https://ukpowernetworks.opendatasoft.com/id/theme/Network Usage"]
urihttps://ukpowernetworks.opendatasoft.com/api/v2/catalog/datasets/ltds-table-3a-load-data-observed
harvest_object_idc7d598c7-949a-4568-82bb-acf377f5dc6f
harvest_source_id4228bca6-c4ef-4f4e-ad91-8b9aa1781a89
harvest_source_titleUK Power Networks