UOU2T3YW
Overview
This endpoint forward view of availability (also referred to as Output Useable data under the Grid Code) for generation and interconnector capacity, accounting for planned outages covering availability data from 2 weeks ahead to 156 weeks ahead; it is aggregated by Balancing Mechanism Units (BMUs). In the context of this report, BMUs can be considered as generating units. Elexon BMUs differs from NGC BMUs by including a prefix e.g. 'T_'. The mapping between NGC and Elexon BMUs can be retrieved via reference data API endpoints.
Additional Information
Key | Value |
---|---|
dcat:versionNotes | Initial test |
oe:sensitivityClass | OE-O |
Files
Related Dataset from Elexon (view all)
Elexon
View allAccess and Licensing
Access conditions
Any controls, requirements, or pre-requisites surrounding access to data
Licence conditions
None
Data Quality
Aggregation Method
Any controls, requirements, or pre-requisites surrounding access to data
Organisational Lineage
The licensing conditions controlling access to the data
Risks
Considerations, risks, and constraints around making assumptions based on specific datasets. e.g data health score
Confidence Level
The level of confidence associated with a specific dataset
Units
The units in which energy is described within a dataset