L o a d i n g
Owner
Department for Energy Security and Net Zero (DESNZ) - view all
Update frequencyunknown
Last updatedabout 1 year ago
OverviewEnergyREACTRenewableUKelectricityplanning
The Renewable Energy Planning Database (REPD) tracks the progress of UK renewable electricity projects over 150kW through the planning system. It provides as accurate and comprehensive a snapshot as possible of projects, and of progress across the technology sectors, through the following stages: inception planning construction operation decommissioning The database is updated during the month following the end of each quarter. Please note: the minimum threshold for installed capacity was 1MW until 2021, at which point it was lowered to 150kW. This means that projects below 1MW that were going through planning system before 2021 may not be represented in the REPD.