IntroductionWhen a generator applies and accepts a connection offer issued by UK Power Networks, and it is connecting to a GSP with no available materiality headroom, UK Power Networks will submit a Project Progression application to vary the BCA (Bilateral Connection Agreement). Methodological Approach Data is compiled from existing datashare between UK Power Networks and the National Energy System Operator. Quality Control Statement Quality Control Measures include: Manual review and correct of data inconsistencies Use of additional verification steps to ensure accuracy in the methodology Assurance Statement The Open Data Team and DSO Regional Development Team worked together ensure data accuracy and consistency. OtherDownload dataset information: Metadata (JSON) Definitions of key terms related to this dataset can be found in the Open Data Portal Glossary: https://ukpowernetworks.opendatasoft.com/pages/glossary/To view this data please register and login.
L o a d i n g
Overview
Additional Information
KeyValue
guidhttps://ukpowernetworks.opendatasoft.com/api/v2/catalog/datasets/ukpn-appendix-g-project-progression
identifierukpn-appendix-g-project-progression
language["http://id.loc.gov/vocabulary/iso639-1/en"]
theme["https://ukpowernetworks.opendatasoft.com/id/theme/Network Usage"]
urihttps://ukpowernetworks.opendatasoft.com/api/v2/catalog/datasets/ukpn-appendix-g-project-progression
harvest_object_id05f7b03c-016e-4baa-b127-5204ab727170
harvest_source_id4228bca6-c4ef-4f4e-ad91-8b9aa1781a89
harvest_source_titleUK Power Networks