Open Net Zero logo
North Sea Link - NESO's Net Transfer Capacity
L o a d i n g
Owner
National Grid ESO - view all
Update frequencyunknown
Last updated3 months ago
Format
Overview

These are the values submitted by NESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per hourly time period. >**NOTE:** Final interconnector capacity is calculated using these NESO values, values from the connected SO and the interconnector capability. Therefore, the interconnector’s final capacity value may be lower than the NESO values shown here. The final values can be found on each interconnector’s trading facilitator’s website. Values will only be published where a restriction has been applied by NESO. If there are no values, NESO has not applied a restriction.

NSLNTCNet Transfer CapacityNetwork Transfer CapacityNorth Sea LinkSubscribable
Additional Information
KeyValue
Update frequencyDaily
harvest_object_idc85efafb-8b87-4da0-a970-a3e6d3c7b27f
harvest_source_id916f7f66-3a3b-43e9-afc0-85d31134d7b3
harvest_source_titleNational Grid ESO
Share this Dataset
Trust Signals
Trust Framework(s)Click to view
Organisation EntryView org in directory
AssuranceIB1 Open Data (ICON)Scheme-specific:
Data Sensitivity Classunknown
Licenceunknown
Files