Open Net Zero logo
Interconnector Register
L o a d i n g
Organization
National Grid ESO - view all
Update frequencyunknown
Last updated11 months ago
Format
Overview

A list of interconnector projects that hold connection contracts with NESO. These include active interconnectors and future interconnector projects. **Note**: The Mega Watt (MW) Total MW Import figures represent firm Transmission Entry Capacity (TEC). Moyle holds a total of 500MW TEC which is subject to operational restrictions **CUSC Definitions** Connection and Use of System Code (CUSC) Definition paragraph 9.4 *EXPORT OF POWER FROM THE INTERCONNECTOR CONNECTION SITE* * MW Import: Subject to the other provisions of the CUSC, the relevant Bilateral Connection Agreement and the Grid Code and any Operating Agreement, The Company shall accept into the National Electricity Transmission System at the connection site of an Interconnector power up to the Transmission Entry Capacity and (if any) Short-Term Transmission Entry Capacity (STTEC) and\or Limited Duration Transmission Entry Capacity (LDTEC) and\or any Temporary Received TEC less any Temporary Donated TEC for the relevant Period as specified in Appendix C to the relevant Bilateral Connection Agreement except to the extent (if any) that The Company is prevented from doing so by transmission constraints which could not be avoided by the exercise of Good Industry Practice. CUSC Definition paragraph *9.5 IMPORT OF POWER TO THE INTERCONNECTOR CONNECTION SITE* * MW Export: Subject to the other provisions of the CUSC, the relevant Bilateral Connection Agreement, the Grid Code and any Operating Agreement, The Company shall transport a supply of power to a Connection Site of an Interconnector through the National Electricity Transmission System up to the amount specified in the Bilateral Connection Agreement except to the extent (if any) that The Company is prevented from doing so by transmission constraints which could not be avoided by the exercise of Good Industry Practice by The Company.

ConnectionInterconnectorRegisterSubscribable
Additional Information
KeyValue
Harvest Object Id44438fec-9769-48c0-9c85-9ce20be93820
Harvest Source Id916f7f66-3a3b-43e9-afc0-85d31134d7b3
Harvest Source TitleNational Grid ESO
Update FrequencyTwice weekly
Share this Dataset
Trust Signals
Trust Framework(s)None
Assuranceunknown
Data Sensitivity Classunknown
Licenceunknown
Files
  • Interconnector Register 14 February 2025