IntroductionThis list outlines the current plans for the development of UK Power Networks' three license areas over the next five years, as detailed in the latest Long Term Development Statement (LTDS) Development Proposals. The LTDS is updated twice a year, at the end of May and November. Please note that these plans may change in both content and timing. All listed projects aim to increase network capacity, while those focused solely on asset replacement are not included. For more information and full reports, visit the landing page below: Long Term Development Statement and Network Development Plan Landing Page Methodological Approach FLOC association: FLOCs are used to associate the LTDS infrastructure upgrade projects to grid and primary substations, to create geopoints. Quality Control Statement Quality Control Measures include: Verification steps to match features only with confirmed functional locations. Manual review and correct of data inconsistencies Use of additional verification steps to ensure accuracy in the methodology Assurance Statement The Open Data Team and Network Insights Team worked together to ensure data accuracy and consistency. Other You can also download dataset information here: Metadata (JSON). Definitions of key terms related to this dataset can be found in the Open Data Portal Glossary: Glossary.
L o a d i n g
OverviewLTDS
Additional Information
KeyValue
guidhttps://ukpowernetworks.opendatasoft.com/api/v2/catalog/datasets/ukpn-ltds-infrastructure-projects
identifierukpn-ltds-infrastructure-projects
language["http://id.loc.gov/vocabulary/iso639-1/en"]
theme["https://ukpowernetworks.opendatasoft.com/id/theme/Network%20Infrastructure", "https://ukpowernetworks.opendatasoft.com/id/theme/Network%20Usage"]
urihttps://ukpowernetworks.opendatasoft.com/api/v2/catalog/datasets/ukpn-ltds-infrastructure-projects
harvest_object_id3c04222c-64f0-421d-92a2-6e984fce3a3a
harvest_source_id4228bca6-c4ef-4f4e-ad91-8b9aa1781a89
harvest_source_titleUK Power Networks