This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface float arrangement. This document details the IO&M and safety procedures for each system and subsystem in the Triton-C WEC.

HawaiiHydrokineticIOMIOM PlanMHKMaintenanceMarineOMOahuOperationsOscilla PowerTritonWECWETSWave Energy Test Sitearrangementdetailed designdrivetrainenergyfabricationfield testgearboxheavehullhull structurehydraulicsinstallationmooringmulti-modepoint absorber buoypowerpower take offreaction ringreliabilitysafetysurface floatsurvivabilitytendonwave energy
Additional Information
KeyValue
Dcat Issued2020-11-02T07:00:00Z
Dcat Modified2025-11-03T07:00:06Z
Dcat Publisher NameOscilla Power, Inc.
Guidhttps://data.openei.org/submissions/8557
Share this Dataset
Trust Signals
Trust Framework(s)None
Assuranceunknown
Data Sensitivity Classunknown
Licenceunknown
Files